Fabricated Metal

Fabricate Right the First Time

Digitize Job Travelers, Welding Procedures, and Inspection for Complex Metalwork

Quality You Can Stamp, Weld, and Prove

Structural and precision fabrication depends on procedures, WPS/PQR alignment, and NDT evidence. Apprentice structures travelers, hold points, and signoffs so inspections are predictable — and documentation is ready when customers or regulators ask.

Every Job Is a Little Different

Custom cuts, weldments, and finishing steps change by customer and drawing revision. Apprentice lets you publish updated travelers instantly and enforce the right checks for each job. Reduce rework from ambiguous work orders and missed prerequisites.

Connect the Shop to Scheduling and Materials

Fabrication stalls when material, drawings, and floor status disagree. Apprentice integrates with ERP and nesting systems so operators execute against the latest revision with confidence. Supervisors see WIP and bottlenecks in real time to protect ship dates.

AI Agents for Fabricated Metal

A1's sub-agents automate the work Fabricated Metal teams spend hours on manually.

Things you can do today, but faster.

Active Troubleshooting GuideGenerate a step-by-step troubleshooting guide for repeated backgauge positioning alarm ALM-147 on Press Brake 3 using the equipment manual, setup sheet, and current job context.
Multi-File SOP Quick-ReferenceI uploaded the startup SOP, tooling change SOP, first article inspection SOP, and shutdown SOP. Find the exact sections required before starting the next job on the press brake line and generate a step-by-step operator guide.
Equipment Setup GuideExtract the startup, tooling verification, and pre-run safety checks from the laser cutter, press brake, and weld cell manuals for today’s production run.

Workflows you never thought possible.

Process Drift AnalysisAnalyze the hourly process data for cycle time, scrap rate, bend angle variation, and weld rework. Identify any trends moving toward control limits and recommend operator checks or adjustments before the job falls out of target.
Throughput & Scrap Improvement ReviewCompare the last three runs for this part family, isolate the biggest losses in throughput, scrap, and rework, and show me the best operator-level improvements for the next run.
Shift SummaryEvery day at 6:45 PM, generate a shift summary from today’s operator notes, downtime log, and first article or in-process inspection checks, then email it to me for review before handoff.